Strict Standards: call_user_func_array() expects parameter 1 to be a valid callback, non-static method JHTML::date() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/html/html.php on line 91
Strict Standards: Non-static method JFactory::getConfig() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/html/html.php on line 222
Strict Standards: Non-static method JFactory::getDate() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/html/html.php on line 225
Strict Standards: Non-static method JLoader::import() should not be called statically in /home/sigurros/public_html/offshore/libraries/loader.php on line 186
Strict Standards: Non-static method JFactory::getLanguage() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/factory.php on line 427
Last Updated on Wednesday, 08 December 2010 11:30
Written by Administrator
Strict Standards: call_user_func_array() expects parameter 1 to be a valid callback, non-static method JHTML::date() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/html/html.php on line 91
Strict Standards: Non-static method JFactory::getConfig() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/html/html.php on line 222
Strict Standards: Non-static method JFactory::getDate() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/html/html.php on line 225
Strict Standards: Non-static method JLoader::import() should not be called statically in /home/sigurros/public_html/offshore/libraries/loader.php on line 186
Strict Standards: Non-static method JFactory::getLanguage() should not be called statically in /home/sigurros/public_html/offshore/libraries/joomla/factory.php on line 427
Saturday, 09 August 2008 16:33
Sigur specialised in hook-up of platforms where we has undertaken project management, engineering and fabrication responsibility. We understand how important first oil or first gas dates are to our customers, so we always aim to better these dates safely.
Our success is built on working with the best people and using our integrated Work Planning System and Completions Management System where we have been able to remove a potentially difficult interface between the fabricator and the hook-up contractor.
A hook up and commissioning team will be established at an early stage of the project from the design team, fabrication personnel and operations personnel to manage the completion work scope. This Integrated Completions Team will provide continuity of key personnel throughout the design, fabrication, onshore commissioning and offshore HU&C phases of the project.
The main project objective is to maximise onshore commissioning, minimise offshore hook up and minimise offshore commissioning leading to platform start up. This is conducted in the safest and most cost-effective manner.
Certified with the essential registrations and accreditations, coupled with a comprehensive quality and HSE systems, Sigur Ros is a multi-disciplinary technical service provider with vast knowledge base, experience and strength in: